Hamad International Airport
Hamad International Airport (formally New Doha International Airport) is the world’s newest aviation hub, a world class facility that is set to exceed expectations and redefine the passenger and transit experience.
IWAN GLOBAL were appointed to this prestigious project working alongside the Principle Contractor. The Principal contractor was a Joint Venture (JV) arrangement between Taisei Corporation from Japan and TAV from Turkey. Construction of the New Doha International Airport (NDIA) lasted from 2011 to 2014.
Cost
US$5 Billion
Gross Area
Over 700,000m²
Main Contractor
JC – TAV Construction & Taisei Corporation
Share
- Client
- Bechtel – OBI (London)
- Release Date
- 2014